James S. Hay
To Moses Austin and Co Dr
1811
April 10 To Fouquier_______________________________ 3.00
May 2 To 1 qt Whky______________________________ .50
13 " 1 do do______________________________ .50
30 " 1 pint do____________________________ .12 1/2
June 7th " 1 pint do_____________________________ .25
July 13 " paper_________________________________ .12 1/2
Sept 12 " 2 Doses Cal. and Jalop @ 75__________ 1.50
" " 1 oz. Barks_______________________________ .75
" " " Shoeing horse______________________ .50
" " Cash payd by S A__________________________ 11.00
" " 1 Bear Skin_______________________________ .50
" " 200 lb Lead @ 5.00________________________ 10.00
" " To our Note payable the 1st Novemr________ 24.00
_______
$52.75
Cr By 2 months Work from the 3d July up to the
3d of Sept.@ 16.00___________________ 32.00
July 13 By John Pigly_______________________________ 1.00
Sept 12 By Owon Baker_______________________________ 2.00
By 562 lb Mineral @ 2.00____________________ 11.24
By Cleaning 300 lb do @ 1$ pr. 1000_________ .30
By so much to be payd by John Swarengen
in Mineral____________________________ 6.21
______
$52.75
Stephen F. Austin
for Moses Austin
Mine a Berton Sept. 12th 1811 Settled Sept. 12th 1811